Low Service Pump 3
Greenwood, SC
UTEC developed specifications for an adjustable speed drive and 200 horsepower vertical hollow shaft induction motor to replace a wound rotor and starter. Commissioners of Public Works
Energy Efficiency Study
Greenwood, SC
UTEC completed an economic feasibility analysis of a project to replace five existing high service pump motors with high efficiency motors. Design of dual feed service including the addition of a 750 kVA 2400/480 V unit substation, medium and low voltage cable and raceway, 480 V interlocked switchgear, 750 kVA transformer for a variable speed drive, medium voltage fused switch and switchgear modifications for the Wise Water Treatment Plant in Greenwood, SC.
Analysis of the effect of harmonic currents and voltages due to non-linear loads at the Wise Water Treatment Plant in Greenwood, SC.
Design, specification, and installation assistance for a fiber optic telemetry system at the WTP in Gaffney, SC.
Evaluation of the power service and distribution system at the Lake Greenwood WTP in Greenwood, SC.
Design of medium voltage switchgear for a new high service pump at the Harwood's Mill WTP in Newport News, VA.
Design of the electric power distribution and process control systems for a WWTP in Harnett County, NC
Evaluation of the telemetry system for the Asheboro, NC WTP. |