PROJECT EXPERIENCE
|
|
|
•
•
•
•
|
Design of a 230 kV line to link the Rowan County 1,400 MW ICTG plant switchyard to the CP&L Woodleaf 500/230 kV Substation.
Design of 115 kV transmission relaying system using current differential and step distance relays for 20 terminals of transmission lines for the Orangeburg, SC DPU.
Design of 100 kV and 69 kV transmission relaying system using current differential and step distance relays for 26 terminals of transmission lines for the High Point, NC Electric Department.
Distribution line relocation projects for CP&L including the following:
- Outer Loop - R2000CB
- New Hope/Capital Boulevard
- Highway 62
- Highway 55 Bypass
- I-540 Project - R2000EB
- North Harrison |
Progress Energy
Effingham Plant 230 kV Switchyard
and Transmission Line |
| |
 |

Gaffney S.C. 100 kV Transmission Line
|
| |
Progress Energy
Effingham Plant 230 kV Transmission Line
|
| |
|
| • |
I-540 Project – Phase 2 |
| • |
US 15-501 Project |
| • |
US Highway 64 – Ramseur |
| • |
Study of the Abbeville, SC 44 kV protective relaying system. |
| • |
Design of 12 miles of 12.47 kV distribution line for the City of High Point, NC. |
| • |
Design of an extension of the 25 kV distribution loop for the Gaffney, SC Board of Public Works. |
| • |
Design of nine miles of 34.5 kV line for Monroe, NC. |
| • |
Design of an underground cable replacement and feeder repair project for N.C. State University in Raleigh, N.C. The project included
the replacement of 15 kV underground cable, oil switches, and transformers, as well as the installation of new PMH switches and cable.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|